Product Introduction
Applications
The product is widely used for the decoration and protection of interior walls in villas, residences, guesthouses, hotels, museums, art galleries, libraries, concert halls, office buildings, international schools, and commercial plazas.
Packaging Specifications
5kg/barrel or 20kg/barrel.
Supporting Coatings and Tools
Supporting Coatings and Usage
- Interior alkali-resistant closed primer: Theoretical consumption is 7-9㎡/kg (one coat). Actual consumption may vary depending on wall roughness or application methods.
- Tiny crystal color coating: Theoretical consumption is 2.5-3.5㎡/kg (1-2 coats). Actual consumption may vary depending on wall roughness or application methods.
- Tiny crystal colored sand coating: Theoretical consumption is 2.5-4㎡/kg (1-2 coats). Actual consumption may vary depending on the material, wall roughness, or application methods.
Note: We will provide and confirm the necessary coatings for your project based on your desired results.
Application Tools
spray gun, masking tape, protective film, etc. (Tools should be prepared according to project requirements).
Application
Wall Inspection and Environmental Requirements Before Application
The wall to be coated should already have a putty layer applied, with a firm, clean surface that is free of cracks, peeling, dust, hollowing, lime bursts, poorly adhered old coatings, and oil stains. The wall moisture content should be less than 5%.
The ambient temperature should be above 8°C, with a relative humidity below 75% RH.
Application Steps
- Roll-coat one layer of Interior alkali-resistant closed primer.
- Spray Tiny crystal color coating / Tiny crystal colored sand coating until achieving full coverage.
- Allow 24 hours for drying.
Precautions During Application
- Before large-scale application, test-coat 1-2㎡ on the wall to confirm that the color and effect match the standard sample before proceeding.
- It is recommended that the same batch of coating be applied by the same team of workers on the same wall to ensure consistent surface effects and avoid uneven finishes.
- Stir the product thoroughly before use. This product does not require dilution.
- Application is strictly prohibited when the ambient temperature is below 8°C, the relative humidity exceeds 70% RH, or during rainy, foggy, or windy weather, as this will affect the formation of the coating.
- During breaks or after application, seal any unused coating tightly to prevent it from drying out in the barrel. Clean tools and clothing promptly; otherwise, dried paint will be difficult to remove.
- It is recommended to reserve 3-5 barrels of material for future maintenance.
Coating Drying Time
- Primer: Drying time is at least 4 hours. Apply the next layer only after the primer is completely dry.
- Tiny crystal color coating / Tiny crystal colored sand coating: Drying time is at least 4 hours.
Storage, Transportation, and Disclaimer
Storage and Transportation
- Transportation: The product is non-flammable, non-explosive, safe, non-toxic, and harmless. Avoid excessive stacking.
- Storage: Store in a sealed container in a dry, cool place at a temperature of 5-30°C. Avoid frost and direct sunlight.
Disclaimer
If the above instructions are violated, resulting in forced application or improper operation, issues such as peeling, chalking, cracking, efflorescence, fading, and other unforeseen coating defects may occur. In such cases, our company and distributors will not bear responsibility for quality issues or economic losses caused. Refer to the product certificate for the product’s shelf life, quality standards, and dilution ratio.


















Reviews
There are no reviews yet.